www.carlonsales.com
26
Installation
Duct Proofing
Use appropriate seal-off kit
(Reference pg. 9 for Line
Blowing Kits). For maximum
line blowing potential, use
air compressor at 175 CFM
(125 PSI Max.)
1.
Slide pull line through
opening in threaded
nozzle end of seal-off.
Attach blowing missile
to pull line.
2.
Insert blowing missile
into individual duct and
insert threaded end of
seal-off into duct to
assure minimal air loss.
3.
Attach seal-off to air
compressor with air
release lever in off
position. Hold seal off
firmly in hands.
4.
Open lever quickly
making sure slight tension
is on to prevent pull line
from packing. CAUTION
SHOULD BE EXERCISED
AT THE EXIT POINT FOR
MISSILE TO AVOID INJURY.
Blow pull line in all ducts
to ensure no blockages are
present.
Installation Instructions
When handling Intra-Gard
®
, care must be taken to avoid
striking the ends against hard surfaces. This can cause damage
from impact or crushing of the end of the conduit.
Assembly In Trench
1.
In the trench, set the first layer of ducts by inserting the male
ends into the female ends on the sections previously placed.
Remove the protective caps as the sections of pipe are about to
be joined together, and make sure the matching colors are aligned.
2.
A thin coating of Carlon
Quick Set Cement should
be applied to the inside
surface of the sockets
lightly enough to pre-
vent the formation of a
bead of cement at the
interior shoulder of the
sockets. Then, apply in
the same manner to the
spigot ends of the con-
duits to the depth of the
socket.
3.
Immediately after apply-
ing the coat of cement
to the conduit, insert the
spigot ends into the
sockets.
Gross Automation (877) 268-3700 · www.carlonsales.com · [email protected]
Vue de la page 0
1 2

Résumé du contenu

Page 1 - Installation

www.carlonsales.com26InstallationDuct ProofingUse appropriate seal-off kit(Reference pg. 9 for LineBlowing Kits). For maximumline blowing potential, u

Page 2 - Field Cuts

www.carlonsales.com27Field CutsJoining a Male/Female Connection1.The pipes should be laid side by side and themale end marked at the base of the bell

Commentaires sur ces manuels